To supplement the national electricity supply, the Nigeria Authorities started a project in developing a gas-powered electricity-generating plant near Lagos in Ogun State. In this project, 900 km 400kV transmission line to Kano and substation are essential parts.
Service and Products Supplied:
Overhead ACSR Conductor
Aerial Earth Wire
Silicon Insulators
Strain Insulators
Drop Out Fuse
Lightning arresters
And part of hardware for towers
Key facts
The project with power plant and transmission line was a strategic plan to secure the power supply to west-region in Venezuela.
The 400kV Transmission line and substation extensions Las Carmelitas Plant- Barquisimeto was a key to whole project.
The delivery period is 6 months
Challenges
The importance of the project is well known to all participants. Any and all down-time experienced during manufacturing causes a major effect on the supply, interrupting service to customers
Solutions
Our experience demonstrated due care during the design and manufacturing stage of the project, minimising down-time
Value and benefits
Security of supply to Barquisimeto was enhanced
Capacity to supply power to west-region was increased substant